Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Gassan | Japan | F H I W | Bonji | 65 | 08/88 | 06/94 | 10/98 | 03/01 | 123 | 393 | 731 | 1160 | V | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 91 | 39 | (F) | |
Ulu Jelai/Susu | Malaysia | H | Bertam, Telom and Lemoi | 18 | 03/11 | 03/14 | 09/15 | 07/16 | 90 | 513 | 731 | 747 | V | (4') | 0.80 | (3')* | 0.80 | (1)* | 400 | 2400 | 100 95 | 0 0 | (-) - |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Bonji
Reservoir capacity: 65 m3x106
Construction Dates
Start of Project: 08/88
Start of RCC: 08/88
End of RCC: 10/98
End of Project: 03/01
Specifications
Height: 123 metres
Length: 393 metres
Volume of RCC: 731 m3x103
Total volume: 1160 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
1000 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |
Details
Country: Malaysia
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Bertam, Telom and Lemoi
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 03/11
Start of RCC: 03/11
End of RCC: 09/15
End of Project: 07/16
Specifications
Height: 90 metres
Length: 513 metres
Volume of RCC: 731 m3x103
Total volume: 747 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 2400 |
Cementitious material
Cement (kg/m3) |
---|
100 |
95 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |
0 |
Search again