Adigüzel II
Download PDF data sheet
Adigüzel II completed

Particulars
Owner: unknown
Designer: CNR Müsavirlik
Contractor:
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 15 m3x106
Height: 61 metres
Length: 145 metres
Volume of RCC: 150 m3x103
Total volume: unknown
Construction Dates
Start of Project: —/12 (— 2012)
Start of RCC: —/13 (— 2013)
End of RCC: —/14 (— 2014)
End of Project: —/15 (— 2015)
Country: Turkey
River: Büyük Menderes
DMS Co-ordinates: 38˚8'5.8"N, 29˚9'23.49"E
DD Co-ordinates: 38.134945, 29.156525
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
