Agdez
Download PDF data sheet
Agdez under construction

Particulars
Owner: unknown
Designer: CID
Contractor: SGTM
Statistics
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
Reservoir capacity: 247 m3x106
Height: 110 metres
Length: 317 metres
Volume of RCC: 833 m3x103
Total volume: 993 m3x103
Construction Dates
Start of Project: 05/16 (May 2016)
Start of RCC: 03/19 (March 2019)
End of RCC: 09/20 (September 2020)
End of Project: 06/21 (June 2021)
Country: Morocco
River: Draa
DMS Co-ordinates: 30˚49'16.44"N, 6˚33'40.86"W
DD Co-ordinates: 30.821232, -6.561349
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |