SEARCHING
... please wait

Agdez

Download PDF data sheet
Agdez under construction
Agdez under construction

Particulars

Owner: unknown

Designer: CID

Contractor: SGTM

Statistics

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

Reservoir capacity: 247 m3x106

Height: 110 metres

Length: 317 metres

Volume of RCC: 833 m3x103

Total volume: 993 m3x103

Construction Dates

Start of Project: 05/16 (May 2016)

Start of RCC: 03/19 (March 2019)

End of RCC: 09/20 (September 2020)

End of Project: 06/21 (June 2021)

Country: Morocco

River: Draa

DMS Co-ordinates: 30˚49'16.44"N, 6˚33'40.86"W

DD Co-ordinates: 30.821232, -6.561349

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork

Downstream

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Natural pozzolan (ASTM Class N)