Akçakoca
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: Uluova Construction Co.
Statistics
Type: Gravity
Purpose(s): Irrigation / Water Supply
Reservoir capacity: 2 m3x106
Height: 66 metres
Length: 148 metres
Volume of RCC: 85 m3x103
Total volume: 130 m3x103
Construction Dates
Start of Project: 01/13 (January 2013)
Start of RCC: 05/15 (May 2015)
End of RCC: 10/16 (October 2016)
End of Project: —/17 (— 2017)
Country: Turkey
River: Sarma
DMS Co-ordinates: 40˚58'53.33"N, 31˚04'37.4"E
DD Co-ordinates: 40.98148, 31.077057
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|