SEARCHING
... please wait

Amatisteros III

Download PDF data sheet
Amatisteros III completed
Amatisteros III completed

Particulars

Owner: unknown

Designer: Confederacion Hidrografica del Sur

Contractor: SACYR

Statistics

Type: Gravity

Purpose(s): Flood Control

Reservoir capacity: 1 m3x106

Height: 15 metres

Length: 75 metres

Volume of RCC: 4 m3x103

Total volume: 5 m3x103

Construction Dates

Start of Project: /91 ( 1991)

Start of RCC: 09/91 (September 1991)

End of RCC: 12/91 (December 1991)

End of Project: /92 ( 1992)

Country: Spain

River: Belén

DMS Co-ordinates: 36˚51'45.22"N, 02˚28'3.73"W

DD Co-ordinates: 36.86256, -2.467703

Facings

Upstream

SlopeType
VerticalRCC against formwork

Downstream

SlopeType
0.75RCC against formwork

Spillway

SlopeType
0.75RCC against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
73
Pozzolan (kg/m3)Pozzolan Type
109Low-lime flyash (ASTM Class F)