Amatisteros III
Download PDF data sheet
Particulars
Owner: unknown
Designer: Confederacion Hidrografica del Sur
Contractor: SACYR
Statistics
Type: Gravity
Purpose(s): Flood Control
Reservoir capacity: 1 m3x106
Height: 15 metres
Length: 75 metres
Volume of RCC: 4 m3x103
Total volume: 5 m3x103
Construction Dates
Start of Project: —/91 (— 1991)
Start of RCC: 09/91 (September 1991)
End of RCC: 12/91 (December 1991)
End of Project: —/92 (— 1992)
Country: Spain
River: Belén
DMS Co-ordinates: 36˚51'45.22"N, 02˚28'3.73"W
DD Co-ordinates: 36.86256, -2.467703
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork |
Spillway
Slope | Type |
---|---|
0.75 | RCC against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
73 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
109 | Low-lime flyash (ASTM Class F) |