SEARCHING
... please wait

Asana

Download PDF data sheet
Asana completed
Asana completed

Particulars

Owner: unknown

Designer: IDP

Contractor: unknown

Statistics

Type: Hardfill

Purpose(s): unknown

Reservoir capacity: unknown

Height: 48 metres

Length: 214 metres

Volume of RCC: 216 m3x103

Total volume: unknown

Construction Dates

Start of Project: /16 ( 2016)

Start of RCC: /17 ( 2017)

End of RCC: /18 ( 2018)

End of Project: /18 ( 2018)

Country: Peru

River: Asana

DMS Co-ordinates: 17˚6'21.49"S, 70˚40'43.68"W

DD Co-ordinates: -17.10597, -70.678802

Facings

Upstream

SlopeType
0.75 

Downstream

SlopeType
0.75 

Spillway

SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type