Asana
Download PDF data sheet
Asana completed

Particulars
Owner: unknown
Designer: IDP
Contractor: unknown
Statistics
Type: Hardfill
Purpose(s): unknown
Reservoir capacity: unknown
Height: 48 metres
Length: 214 metres
Volume of RCC: 216 m3x103
Total volume: unknown
Construction Dates
Start of Project: —/16 (— 2016)
Start of RCC: —/17 (— 2017)
End of RCC: —/18 (— 2018)
End of Project: —/18 (— 2018)
Country: Peru
River: Asana
DMS Co-ordinates: 17˚6'21.49"S, 70˚40'43.68"W
DD Co-ordinates: -17.10597, -70.678802
Facings
Upstream
| Slope | Type |
|---|---|
| 0.75 |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
