SEARCHING
... please wait

Autódromo

Download PDF data sheet
Autódromo completed
Autódromo completed

Particulars

Owner: unknown

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 4 m3x106

Height: 23 metres

Length: 200 metres

Volume of RCC: 21 m3x103

Total volume: 47 m3x103

Construction Dates

Start of Project: /10 ( 2010)

Start of RCC: /10 ( 2010)

End of RCC: /11 ( 2011)

End of Project: /11 ( 2011)

Country: Brazil

River: Carreiro

DMS Co-ordinates: 28˚49'41.67"S, 51˚50'31.87"W

DD Co-ordinates: -28.828241, -51.842186

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
67
Pozzolan (kg/m3)Pozzolan Type
17Natural pozzolan (ASTM Class N)