Baishi

Download PDF data sheet
Baishi completed
Baishi completed

Particulars

Owner: unknown

Designer: Institute of Design & Investigation of Water Resources in Shenyang, Liaoning Province

Contractor: Department of Water Resources and Hydropower, Liaoning Province

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

Reservoir capacity: 1645 m3x106

Height: 49 metres

Length: 513 metres

Volume of RCC: 111 m3x103

Total volume: 603 m3x103

Construction Dates

Start of Project: 09/96 (September 1996)

Start of RCC: 04/97 (April 1997)

End of RCC: 09/99 (September 1999)

End of Project: 12/00 (December 2000)

Country: China

River: Dalinghe

DMS Co-ordinates: 41˚40'45.08"N, 121˚0'20.95"E

DD Co-ordinates: 41.679188, 121.005821

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork

Downstream

SlopeType
0.70Traditional concrete against formwork

Spillway

SlopeType
0.76Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
58Low-lime flyash (ASTM Class F)