Ban Ve
 Download PDF data sheet
Ban Ve completed 

Particulars
Owner: unknown
Designer: PECC1 (Power Engineering Consulting Company Nº1)
Contractor: Song Da Corporation (SDC)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 1500 m3x106
Height: 136 metres
Length: 480 metres
Volume of RCC: 1520 m3x103
Total volume: 1750 m3x103
Construction Dates
Start of Project: 08/04 (August 2004)
Start of RCC: 02/07 (February 2007)
End of RCC: 10/10 (October 2010)
End of Project: 12/11 (December 2011)
Country: Vietnam
River: Ca
DMS Co-ordinates: 19˚20'44.84"N, 104˚28'59.61"E
DD Co-ordinates: 19.345791, 104.483223
Facings
Upstream
| Slope | Type | 
|---|---|
| v | RCC against formwork (GEVR/GE-RCC) | 
| 0.30 | 
Downstream
| Slope | Type | 
|---|---|
| 0.85 | RCC against formwork (GEVR/GE-RCC) [stepped face] | 
Spillway
| Slope | Type | 
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 80 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 120 | Natural pozzolan (ASTM Class N) | 

 
  
 