Barra Grande
Download PDF data sheet
Barra Grande on Google Earth

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 50000 m3x106
Height: 85 metres
Length: 665 metres
Volume of RCC: 1 m3x103
Total volume: unknown
Construction Dates
Start of Project: —/01 (— 2001)
Start of RCC: —/02 (— 2002)
End of RCC: —/05 (— 2005)
End of Project: —/06 (— 2006)
Country: Brazil
River: Pelotas
DMS Co-ordinates: 27˚46'50.78"S, 51˚11'32.57"W
DD Co-ordinates: -27.780771, -51.192383
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
