Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 8 m3x106
Height: 78 metres
Length: 176 metres
Volume of RCC: 186 m3x103
Total volume: 209 m3x103
Construction Dates
Start of Project: 09/08 (September 2008)
Start of RCC: —/13 (— 2013)
End of RCC: —/16 (— 2016)
End of Project: —/17 (— 2017)
Country: Turkey
River: Bembo
DMS Co-ordinates: 37˚19'12.62"N, 44˚26'49.47"E
DD Co-ordinates: 37.320171, 44.447075
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 1200 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
80 | Natural pozzolan (ASTM Class N) |