SEARCHING
... please wait

Beyyurdu

< Back to search results

Download PDF data sheet
Beyyurdu under construction
Beyyurdu under construction

Particulars

Owner: DSI - State Hydraulic Works

Designer: Su Yapi Engineering and Consulting Inc.

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 8 m3x106

Height: 78 metres

Length: 176 metres

Volume of RCC: 186 m3x103

Total volume: 209 m3x103

Construction Dates

Start of Project: 09/08 (September 2008)

Start of RCC: /13 ( 2013)

End of RCC: /16 ( 2016)

End of Project: /17 ( 2017)

Country: Turkey

River: Bembo

DMS Co-ordinates: 37˚19'12.62"N, 44˚26'49.47"E

DD Co-ordinates: 37.320171, 44.447075

Facings

Upstream

SlopeType
0.10Traditional concrete against formwork

Downstream

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
80Natural pozzolan (ASTM Class N)