Big Cherry
Download PDF data sheet
Particulars
Owner: unknown
Designer: Dewberry & Davis, GEI Consultants & Kleinfelder
Contractor: Estes Brothers Construction
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 2 m3x106
Height: 26 metres
Length: 113 metres
Volume of RCC: 11 m3x103
Total volume: 12 m3x103
Construction Dates
Start of Project: 04/04 (April 2004)
Start of RCC: 09/04 (September 2004)
End of RCC: 01/05 (January 2005)
End of Project: 07/05 (July 2005)
Country: USA
River: South Fork, Powell River
DMS Co-ordinates: 36˚50'47.00"N, 82˚40'19.84"W
DD Co-ordinates: 36.84639, -82.67218
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
82 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
82 | Low-lime flyash (ASTM Class F) |