Boussiaba
Download PDF data sheet
Particulars
Owner: unknown
Designer: EDF-CHI (Centre Ingénierie Hydraulique of Electricité de France)
Contractor: Zagope/Andrade Gutierrez
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 120 m3x106
Height: 51 metres
Length: 310 metres
Volume of RCC: 160 m3x103
Total volume: 190 m3x103
Construction Dates
Start of Project: 12/06 (December 2006)
Start of RCC: 05/08 (May 2008)
End of RCC: 11/08 (November 2008)
End of Project: 08/09 (August 2009)
Country: Algeria
River: Boussiaba
DMS Co-ordinates: 36˚47'32.26"N, 6˚19'5.27"E
DD Co-ordinates: 36.792294, 6.318131
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
112 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
28 | Low-lime flyash (ASTM Class F) |