Bui
Download PDF data sheet
Particulars
Owner: unknown
Designer: Tractebel (Coyne et Bellier)
Contractor: SinoHydro Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower / Irrigation
Reservoir capacity: 12570 m3x106
Height: 108 metres
Length: 493 metres
Volume of RCC: 830 m3x103
Total volume: 900 m3x103
Construction Dates
Start of Project: 10/07 (October 2007)
Start of RCC: 02/09 (February 2009)
End of RCC: 05/12 (May 2012)
End of Project: 11/14 (November 2014)
Country: Ghana
River: Bui
DMS Co-ordinates: 8˚16'43.13"N, 2˚14'13.49"W
DD Co-ordinates: 8.278647, -2.237081
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
45 |
61 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
85 | Low-lime flyash (ASTM Class F) |
91 |