Caçu
Download PDF data sheet
Caçu completed

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 40 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/07 (— 2007)
Start of RCC: —/08 (— 2008)
End of RCC: —/09 (— 2009)
End of Project: —/10 (— 2010)
Country: Brazil
River: Claro
DMS Co-ordinates: 18˚31'56.04"S, 51˚08'54.75"W
DD Co-ordinates: -18.532232, -51.14854
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
