Caculo-Cabaça
Download PDF data sheet
Particulars
Owner: unknown
Designer: COBA
Contractor: CGGC & Voith J.V.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 436 m3x106
Height: 103 metres
Length: 553 metres
Volume of RCC: 1075 m3x103
Total volume: 1450 m3x103
Construction Dates
Start of Project: 08/17 (August 2017)
Start of RCC: —/20 (— 2020)
End of RCC: —/23 (— 2023)
End of Project: 03/24 (March 2024)
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.85 |
Spillway
Slope | Type |
---|---|
0.85 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 2400 |
Cementitious material
Cement (kg/m3) |
---|
100 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | |