SEARCHING
... please wait

Capillucas

Download PDF data sheet
Capillucas completed
Capillucas completed

Particulars

Owner: unknown

Designer: Ingetec SA, Bogota, Colombia

Contractor: JV of J.J. Camet (Peru) and Sam Martin (Chile)

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 5 m3x106

Height: 34 metres

Length: 60 metres

Volume of RCC: 75 m3x103

Total volume: 75 m3x103

Construction Dates

Start of Project: 01/07 (January 2007)

Start of RCC: 10/08 (October 2008)

End of RCC: 04/09 (April 2009)

End of Project: 10/09 (October 2009)

Country: Peru

River: Canete

DMS Co-ordinates: 12˚42'52.73"S, 75˚57'38.05"W

DD Co-ordinates: -12.714647, -75.960571

Facings

Upstream

SlopeType
0.375RCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
90Natural pozzolan (ASTM Class N)