Capulin-San Pablo
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: Carbon Ingenieria
Contractor: Geopresas
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 49 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/15 (— 2015)
Start of RCC: —/16 (— 2016)
End of RCC: —/19 (— 2019)
End of Project: —/20 (— 2020)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
