Capulin-San Pablo
Download PDF data sheet
Particulars
Owner: unknown
Designer: Carbon Ingenieria
Contractor: Geopresas
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 49 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/15 (— 2015)
Start of RCC: —/16 (— 2016)
End of RCC: —/19 (— 2019)
End of Project: —/20 (— 2020)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|