Cerro del Águila

Download PDF data sheet
Cerro del Águila completed
Cerro del Águila completed

Particulars

Owner: unknown

Designer: Lombadi Engineering Ltd.

Contractor: Astaldi Spa and Gym-Grana y Montero S.A. JV

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 37 m3x106

Height: 89 metres

Length: 270 metres

Volume of RCC: 250 m3x103

Total volume: 450 m3x103

Construction Dates

Start of Project: 11/12 (November 2012)

Start of RCC: 08/14 (August 2014)

End of RCC: 06/15 (June 2015)

End of Project: /16 ( 2016)

Country: Peru

River: Mantaro

DMS Co-ordinates: 12˚17'29"S, 74˚41'04"W

DD Co-ordinates: -12.291389, -74.684441

Facings

Upstream

SlopeType
0.10Traditional concrete against formwork

Downstream

SlopeType
0.75Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300600

Cementitious material

Cement (kg/m3)
115
Pozzolan (kg/m3)Pozzolan Type
23