Çetin
Download PDF data sheet
Photo coming soon

Statistics
Type: Hardfill
Purpose(s): Hydropower
Reservoir capacity: 614 m3x106
Height: 165 metres
Length: 492 metres
Volume of RCC: 4741 m3x103
Total volume: 4800 m3x103
Construction Dates
Start of Project: —/12 (— 2012)
Start of RCC: 09/18 (September 2018)
End of RCC: 01/20 (January 2020)
End of Project: 03/20 (March 2020)
Country: Turkey
River: Botan
DMS Co-ordinates: 37˚58'26.17"N, 42˚22'39.38"E
DD Co-ordinates: 37.973934, 42.377605
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |