Chame Shir
Download PDF data sheet
Chame Shir under construction

Particulars
Owner: Iran Water & Power Resources Development Compay (IWPC)
Designer: Tehran-Sahab
Contractor: Sabir
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
Reservoir capacity: 2300 m3x106
Height: 151 metres
Length: 680 metres
Volume of RCC: 1100 m3x103
Total volume: unknown
Construction Dates
Start of Project: —/11 (— 2011)
Start of RCC: —/14 (— 2014)
End of RCC: —/20 (— 2020)
End of Project: —/22 (— 2022)
Country: Iran
River: Zohreh
DMS Co-ordinates: 30˚10'58"N, 50˚52'29"E
DD Co-ordinates: 30.182777, 50.874722
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.70 |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
160 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |