Changzhou
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 56 m3x106
Height: 56 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/93 (— 1993)
Start of RCC: —/02 (— 2002)
End of RCC: —/05 (— 2005)
End of Project: —/07 (— 2007)
Country: China
River: Xunjiang
DMS Co-ordinates: 23˚26'21.54"N, 111˚12'42.13"E
DD Co-ordinates: 23.439316, 111.2117
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|