Concepción
Download PDF data sheet
Particulars
Owner: unknown
Designer: Consortium of Servizi Techici Internazionali (I.T.S.) S.p.A and C.Lotti & Associati S.p.A ) (CONC.I.L.)
Contractor: Astaldi S.p.A.
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 35 m3x106
Height: 68 metres
Length: 694 metres
Volume of RCC: 270 m3x103
Total volume: 290 m3x103
Construction Dates
Start of Project: 12/88 (December 1988)
Start of RCC: 12/89 (December 1989)
End of RCC: 06/90 (June 1990)
End of Project: 08/90 (August 1990)
Country: Honduras
River: Concepción
DMS Co-ordinates: 13˚59'22.96"N, 87˚15'46.90"W
DD Co-ordinates: 13.989711, -87.263031
Facings
Upstream
Slope | Type |
---|---|
0.075 | Traditional concrete against formwork with external geomembrane |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
65 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |