Dahuaqiao
Download PDF data sheet
Particulars
Owner: unknown
Designer: Beijing Engineering Corporation Ltd.
Contractor: Construction Bureau Nº8 (now SinoHydro Co. Ltd.)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 293 m3x106
Height: 107 metres
Length: 232 metres
Volume of RCC: unknown
Total volume: 112 m3x103
Construction Dates
Start of Project: —/10 (— 2010)
Start of RCC: —/13 (— 2013)
End of RCC: —/18 (— 2018)
End of Project: —/19 (— 2019)
Country: China
River: Lancang (Mekong)
DMS Co-ordinates: 26˚20'11"N, 99˚08'51"E
DD Co-ordinates: 26.33639, 99.147499
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|