Dong Nai 2
Download PDF data sheet
Dong Nai 2 completed

Particulars
Owner: unknown
Designer: PECC1 (Power Engineering Consulting Company Nº1)
Contractor: Trung Nam Engineering and Construction Jointstock Company
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 281 m3x106
Height: 80 metres
Length: 429 metres
Volume of RCC: 786 m3x103
Total volume: 1025 m3x103
Construction Dates
Start of Project: 04/09 (April 2009)
Start of RCC: 12/10 (December 2010)
End of RCC: 05/12 (May 2012)
End of Project: 03/13 (March 2013)
Country: Vietnam
River: Dong Nai
DMS Co-ordinates: 11˚42'47.1"N, 108˚03'28.38"E
DD Co-ordinates: 11.713083, 108.057884
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Natural pozzolan (ASTM Class N) |
| 110 |
