Dong Nai 2
Download PDF data sheet
Particulars
Owner: unknown
Designer: PECC1 (Power Engineering Consulting Company Nº1)
Contractor: Trung Nam Engineering and Construction Jointstock Company
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 281 m3x106
Height: 80 metres
Length: 429 metres
Volume of RCC: 786 m3x103
Total volume: 1025 m3x103
Construction Dates
Start of Project: 04/09 (April 2009)
Start of RCC: 12/10 (December 2010)
End of RCC: 05/12 (May 2012)
End of Project: 03/13 (March 2013)
Country: Vietnam
River: Dong Nai
DMS Co-ordinates: 11˚42'47.1"N, 108˚03'28.38"E
DD Co-ordinates: 11.713083, 108.057884
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
80 |
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
120 | Natural pozzolan (ASTM Class N) |
110 |