Dong Nai 4
 Download PDF data sheet
Dong Nai 4 completed 

Particulars
Owner: unknown
Designer: PECC2 (Power Engineering Consulting Company Nº2)
Contractor: GCC4
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 337 m3x106
Height: 128 metres
Length: 481 metres
Volume of RCC: 1305 m3x103
Total volume: 1370 m3x103
Construction Dates
Start of Project: 12/04 (December 2004)
Start of RCC: 03/09 (March 2009)
End of RCC: 06/11 (June 2011)
End of Project: —/12 (— 2012)
Country: Vietnam
River: Dong Nai
DMS Co-ordinates: 11˚53'6.74"N, 107˚43'42.96"E
DD Co-ordinates: 11.885206, 107.7286
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | Traditional concrete against formwork | 
Downstream
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork | 
Spillway
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 85 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 115 | Natural pozzolan (ASTM Class N) | 

 
  
 