El Tablón
Download PDF data sheet
El Tablón completed

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: unknown
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 61 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/19 (— 2019)
Start of RCC: —/21 (— 2021)
End of RCC: —/22 (— 2022)
End of Project: —/23 (— 2023)
Country: Honduras
River: Chamelecón
DMS Co-ordinates: 15˚19'16.1"N, 88˚12'43.78"W
DD Co-ordinates: 15.321139, -88.212158
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
