El Tornillito
Download PDF data sheet
El Tornillito completed

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 242 m3x106
Height: 83 metres
Length: 440 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/17 (— 2017)
Start of RCC: —/21 (— 2021)
End of RCC: 05/23 (May 2023)
End of Project: 10/24 (October 2024)
Country: Honduras
River: Ulua
DMS Co-ordinates: 15˚13'4.76"N, 88˚2'18.34"W
DD Co-ordinates: 15.217989, -88.038429