SEARCHING
... please wait

El Tornillito

Download PDF data sheet
El Tornillito completed
El Tornillito completed

Particulars

Owner: unknown

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 242 m3x106

Height: 83 metres

Length: 440 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /17 ( 2017)

Start of RCC: /21 ( 2021)

End of RCC: 05/23 (May 2023)

End of Project: 10/24 (October 2024)

Country: Honduras

River: Ulua

DMS Co-ordinates: 15˚13'4.76"N, 88˚2'18.34"W

DD Co-ordinates: 15.217989, -88.038429

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type