Fengxiangxia
Download PDF data sheet
Particulars
Owner: unknown
Designer: Fuling Investigation, Design & Research Institute of Water Resources & Hydropower
Contractor: unknown
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 8 m3x106
Height: 90 metres
Length: 158 metres
Volume of RCC: unknown
Total volume: 770 m3x103
Construction Dates
Start of Project: —/93 (— 1993)
Start of RCC: —/95 (— 1995)
End of RCC: —/97 (— 1997)
End of Project: —/98 (— 1998)
Facings
Upstream
Slope | Type |
---|---|
0.10 |
Downstream
Slope | Type |
---|---|
0.76 |
Spillway
Slope | Type |
---|---|
0.76 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|