Gantangping
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: Indsitute of Hydropower Design, Rongzhou City
Contractor: Headquarters of Water Resources and Civil Engineering, Lanshan City
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 9 m3x106
Height: 52 metres
Length: 180 metres
Volume of RCC: unknown
Total volume: 220 m3x103
Construction Dates
Start of Project: —/84 (— 1984)
Start of RCC: —/86 (— 1986)
End of RCC: —/88 (— 1988)
End of Project: —/90 (— 1990)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |