Gaobazhou
Download PDF data sheet
Particulars
Owner: unknown
Designer: Changjiang Water Resources Commission, MWR
Contractor: Gezhouba Construction Bureau
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
Reservoir capacity: 536 m3x106
Height: 57 metres
Length: 440 metres
Volume of RCC: 210 m3x103
Total volume: 940 m3x103
Construction Dates
Start of Project: 05/97 (May 1997)
Start of RCC: 11/98 (November 1998)
End of RCC: 04/00 (April 2000)
End of Project: 01/01 (January 2001)
Country: China
River: Qingjiang
DMS Co-ordinates: 30˚23'52.95"N, 111˚20'30.12"E
DD Co-ordinates: 30.398043, 111.341698
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
123 |
86 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
100 | Low-lime flyash (ASTM Class F) |
86 |