Ghatghar (Upper dam)
Download PDF data sheet
Particulars
Owner: unknown
Designer: Electric Power Development Co. Ltd. & TCE Consulting Engineers
Contractor: M/s Patel Engineering Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 6 m3x106
Height: 15 metres
Length: 503 metres
Volume of RCC: 35 m3x103
Total volume: 40 m3x103
Construction Dates
Start of Project: 12/01 (December 2001)
Start of RCC: 05/03 (May 2003)
End of RCC: 01/04 (January 2004)
End of Project: 06/04 (June 2004)
Country: India
River: Pravara
DMS Co-ordinates: 19˚32'33.56"N, 73˚39'56.05"E
DD Co-ordinates: 19.542656, 73.665565
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
88 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
132 | Low-lime flyash (ASTM Class F) |