Gibe III
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: Salini - Impregilo SpA
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 14690 m3x106
Height: 246 metres
Length: 630 metres
Volume of RCC: 6200 m3x103
Total volume: 6400 m3x103
Construction Dates
Start of Project: 04/08 (April 2008)
Start of RCC: 12/11 (December 2011)
End of RCC: 10/15 (October 2015)
End of Project: —/16 (— 2016)
Country: Ethiopia
River: Omo
DMS Co-ordinates: 6˚50'50"N, 37˚18'06.04"E
DD Co-ordinates: 6.847222, 37.301388
Facings
Upstream
Slope | Type |
---|---|
0.25 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
1.00 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
1.00 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
70 to |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
45 to | Ground-granulated blast-furnace slag |