Gomal Zam
Download PDF data sheet
Particulars
Owner: unknown
Designer: China Water Resources Beifang Investigation, Design and Research Co. Ltd. (BIDR), China (as sub-Contractor to FWO)
Contractor: Frontier Works Organisation (FWO), Pakistan as EPC Contract with SinoHydro Co. Ltd. as sub-Contractor
Statistics
Type: Arch-Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
Reservoir capacity: 1424 m3x106
Height: 133 metres
Length: 231 metres
Volume of RCC: 390 m3x103
Total volume: 474 m3x103
Construction Dates
Start of Project: 07/02 (July 2002)
Start of RCC: 12/08 (December 2008)
End of RCC: 03/11 (March 2011)
End of Project: 09/11 (September 2011)
Country: Pakistan
River: Gomal
DMS Co-ordinates: 32˚5'55.98"N, 69˚52'53.18"E
DD Co-ordinates: 32.098885, 69.881439
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.60 |
Spillway
Slope | Type |
---|---|
0.60 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 to |
4000 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
91 | Low-lime flyash (ASTM Class F) |