SEARCHING
... please wait

Guandi

Download PDF data sheet
Guandi completed
Guandi completed

Particulars

Owner: unknown

Designer: Hydrochina Chengdu Engineering Corporation

Contractor: 4th Construction Bureau

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 760 m3x106

Height: 168 metres

Length: 516 metres

Volume of RCC: 2970 m3x103

Total volume: 3020 m3x103

Construction Dates

Start of Project: /09 ( 2009)

Start of RCC: /10 ( 2010)

End of RCC: /12 ( 2012)

End of Project: /13 ( 2013)

Country: China

River: Yalong

DMS Co-ordinates: 27˚49'19.49"N, 101˚52'51.65"E

DD Co-ordinates: 27.822081, 101.881012

Facings

Upstream

SlopeType
Vertical 
0.30 

Downstream

SlopeType
  

Spillway

SlopeType
0.70 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
88Low-lime flyash (ASTM Class F)