Gwayi-Shangani
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 634 m3x106
Height: 70 metres
Length: 305 metres
Volume of RCC: unknown
Total volume: 300 m3x103
Construction Dates
Start of Project: 09/04 (September 2004)
Start of RCC: —/22 (— 2022)
End of RCC: —/24 (— 2024)
End of Project: —/25 (— 2025)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
140 | Low-lime flyash (ASTM Class F) |