SEARCHING
... please wait

Hudson River Nº11

Download PDF data sheet
Hudson River Nº11 completed
Hudson River Nº11 completed

Particulars

Owner: unknown

Designer: NRCS –Georgia

Contractor: Dames and Moore

Statistics

Type: Gravity

Purpose(s): Water Supply

Reservoir capacity: unknown

Height: 21 metres

Length: 168 metres

Volume of RCC: 26 m3x103

Total volume: 28 m3x103

Construction Dates

Start of Project: 11/92 (November 1992)

Start of RCC: 04/93 (April 1993)

End of RCC: 08/93 (August 1993)

End of Project: /93 ( 1993)

Country: USA

River: Mountain Creek

DMS Co-ordinates: 34˚27'44.86"N, 83˚31'38.94"W

DD Co-ordinates: 34.46246, -83.527481

Facings

Upstream

SlopeType
VerticalTraditional concrete against precast concrete panels with geomembrane

Downstream

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
119
Pozzolan (kg/m3)Pozzolan Type
84Low-lime flyash (ASTM Class F)