Huizhou PSS - Upper dam
Download PDF data sheet
Particulars
Owner: unknown
Designer: Guangdong Provincial Investigation and Design Institute of Water Conservancy and Electric Power
Contractor: 8th Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 30 m3x106
Height: 56 metres
Length: 168 metres
Volume of RCC: 84 m3x103
Total volume: 93 m3x103
Construction Dates
Start of Project: 10/04 (October 2004)
Start of RCC: 12/05 (December 2005)
End of RCC: 05/07 (May 2007)
End of Project: —/11 (— 2011)
Country: China
River: Xiaojinhe
DMS Co-ordinates: 23˚16'40.26"N, 114˚22'00.14"E
DD Co-ordinates: 23.277849, 114.366707
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
125 | Low-lime flyash (ASTM Class F) |