Hunting Run
Download PDF data sheet
Particulars
Owner: unknown
Designer: Gannett Fleming, Inc.
Contractor: ASI-RCC, Inc.
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 2 m3x106
Height: 36 metres
Length: 720 metres
Volume of RCC: 115 m3x103
Total volume: 128 m3x103
Construction Dates
Start of Project: 05/00 (May 2000)
Start of RCC: 02/01 (February 2001)
End of RCC: 01/02 (January 2002)
End of Project: 08/02 (August 2002)
Country: USA
River: Hunting Run
DMS Co-ordinates: 38˚21'8.09"N, 77˚38'18.33"W
DD Co-ordinates: 38.352245, -77.638428
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against precast concrete panels with geomembrane |
Downstream
Slope | Type |
---|---|
Unformed face of RCC |
Spillway
Slope | Type |
---|---|
Unformed face of RCC |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
74 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
37 | Low-lime flyash (ASTM Class F) |