SEARCHING
... please wait

Jim Wilson (formerly Town Wash Detention)

Download PDF data sheet
Jim Wilson (formerly Town Wash Detention) completed
Jim Wilson (formerly Town Wash Detention) completed

Particulars

Owner: unknown

Designer: CH2M - Hill, Redding, California

Contractor: Progressive Contracting Inc.

Statistics

Type: Gravity

Purpose(s): Flood Control

Reservoir capacity: unknown

Height: 18 metres

Length: 264 metres

Volume of RCC: 43 m3x103

Total volume: 45 m3x103

Construction Dates

Start of Project: 01/92 (January 1992)

Start of RCC: 03/92 (March 1992)

End of RCC: 05/92 (May 1992)

End of Project: 06/92 (June 1992)

Country: USA

River: Town Wash

DMS Co-ordinates: 36˚49'32.46"N, 114˚04'22.48"W

DD Co-ordinates: 36.825684, -114.072914

Facings

Upstream

SlopeType
VerticalSlip-formed/extruded facing elements

Downstream

SlopeType
1.50RCC against formwork

Spillway

SlopeType
1.50RCC against formwork  [stepped face]
 Unformed face of RCC  [stepped face]

Placement

Layers (mm)Lifts (mm)
200200

Cementitious material

Cement (kg/m3)
107
Pozzolan (kg/m3)Pozzolan Type
71Low-lime flyash (ASTM Class F)