SEARCHING
... please wait

Jing Hong

Download PDF data sheet
Jing Hong completed
Jing Hong completed

Particulars

Owner: unknown

Designer: Kunming Investigation and Design Institute of Hydropower

Contractor: 3rd Construction Bureau & Gezhouba Construction Bureau

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Recreation

Reservoir capacity: 1139 m3x106

Height: 108 metres

Length: 705 metres

Volume of RCC: 848 m3x103

Total volume: 3068 m3x103

Construction Dates

Start of Project: /04 ( 2004)

Start of RCC: /05 ( 2005)

End of RCC: /08 ( 2008)

End of Project: /09 ( 2009)

Country: China

River: Lancang

DMS Co-ordinates: 22˚03'7.28"N, 100˚45'59.84"E

DD Co-ordinates: 22.052023, 100.766624

Facings

Upstream

SlopeType
VerticalRCC against formwork

Downstream

SlopeType
0.80RCC against formwork

Spillway

SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
64
93
Pozzolan (kg/m3)Pozzolan Type
93Ground-granulated blast-furnace slag
93