SEARCHING
... please wait

Kido

Download PDF data sheet
Kido completed
Kido completed

Particulars

Owner: unknown

Designer: Fukushima-ken

Contractor: Maeda Construction Co. Ltd., Nissan Construction Co. Ltd. and Tanaka Construction Co. Ltd. J.V.

Statistics

Type: Gravity

Purpose(s): Flood Control / Irrigation / Navigation / Water Supply

Reservoir capacity: 19 m3x106

Height: 94 metres

Length: 350 metres

Volume of RCC: 291 m3x103

Total volume: 501 m3x103

Construction Dates

Start of Project: 10/00 (October 2000)

Start of RCC: 06/03 (June 2003)

End of RCC: 08/05 (August 2005)

End of Project: 03/08 (March 2008)

Country: Japan

River: Kido

DMS Co-ordinates: 37˚16'17.6"N, 140˚54'52.18"E

DD Co-ordinates: 37.271557, 140.91449

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork

Downstream

SlopeType
0.78Traditional concrete against formwork

Spillway

SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750
 1000

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)