SEARCHING
... please wait

Köroglu Kotanli 1

Download PDF data sheet
Köroglu Kotanli 1 completed
Köroglu Kotanli 1 completed

Particulars

Owner: unknown

Designer: ARQ/Antra

Contractor: Unal Insaat

Statistics

Type: Arch-Gravity

Purpose(s): Hydropower

Reservoir capacity: 73 m3x106

Height: 100 metres

Length: 404 metres

Volume of RCC: 640 m3x103

Total volume: 680 m3x103

Construction Dates

Start of Project: 03/15 (March 2015)

Start of RCC: 06/15 (June 2015)

End of RCC: 02/17 (February 2017)

End of Project: 04/17 (April 2017)

Country: Turkey

River: Kura

DMS Co-ordinates: 41˚10'5"N, 42˚57'22"E

DD Co-ordinates: 41.168056, 42.956112

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.60RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
0.60Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)