Koukoutamba
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 86 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 07/17 (July 2017)
Start of RCC: —/22 (— 2022)
End of RCC: —/24 (— 2024)
End of Project: —/25 (— 2025)
Country: Guinea
River: Bafing
DMS Co-ordinates: 11˚16'16.82"N, 11˚22'55.91"W
DD Co-ordinates: 11.271338, -11.382197